A Comprehensive Review on Cost Optimization by Resource Allocation Using Primavera
DOI:
https://doi.org/10.24113/ijoscience.v4i9.159Abstract
Resources play vital role in construction projects. The performance of construction industry depends chiefly on how best the resources are managed. Optimization play pivotal role in resource management, but task is highly haphazard and chaotic under the influence of complexities and vastness. Management always looks for optimum utility of resources available with them. Hence, the project management has got important place especially in resource allocation and smooth functioning with allocated budget. To achieve these goals and to exercise enhance optimization certain tools are used for resource allocation optimally. Implementation of construction project needs a proper planning and scheduling is of vital importance for the project to be executed and run smoothly. A best schedule has to be prepared in such a way that meets the primary objectives of the total project. Those essential destinations are to make a quality venture, finished on time, inside spending plan, and in a sheltered workplace.
Downloads
References
Piyush Pramod Bagade and Prof. Abhijit Bhirud, “Review on construction project management software primavera p6” International journal of engineering sciences & research technology, ISSN: 2277-9655, January, 2018, PN (110-117).
Poonam Raykar and Ghadge A.N., “Analyzing the Critical Factors Influencing the Time Overrun and Cost Overrun in Construction Project” International Journal of Engineering Research, Volume No.5, 2016.
A. Ray Chaudhuri, B. Sivakonda Reddy and S.K. nimbal, “Resource Management in Construction Projects – a case study” Engineering Science and Technology: An International Journal (ESTIJ), ISSN: 2250-3498, Vol.2, No. 4, August 2017 PN (660 – 665).
T.Siva Nagaraju, Sri Lakshmana Kumar, “Schedule And Resources Optimization Using Primavera In Metro Rail Project”, IRF International Conference, 2016.
A.R. Nikumbh and S.S. Pimpliker, “Planning and controlling of a National Highway Project- A case study”, Journal of the Indian Road Congress Paper No.613, April – June 2014 PN (91 – 102).
P M Wale, N D. Jain , N R Godhani , S R Beniwal and A A Mir, «Planning and Scheduling of Project using Microsoft Project (Case Study of a building in India», IOSR Journal of Mechanical and Civil Engineering, ISSN: 2320-334X, Volume 12, Issue 3 Ver. III (May. - Jun. 2015), PN 57-63.
Shaik Mohammad, Kunal B. Badgujar, B.A.Konnur and Amarsinh B. Landage “A Review of EVM Analysis with Primavera”; International Journal of Engineering Research ISSN:23196890(online),2347-5013 Volume No.5, Issue Special 1 9 Jan 2014 PN: 164-167.
Hamid, R. Gupta, Parag S. Mahatme and Taran C. Bhagat “The cost controlling and monitoring of Construction project through earned Value management system” International Journal of Advanced Technology in Engineering and Science www.ijates.com Volume No 03, Special Issue No. 01, March 2013 ISSN (online): 2348 – 7550.
K Swarna Kumari And J Vikranth, “A Study On Resource Planning In Highway Construction Projects”, International Journal of Engineering Research And Application Volume 2, Issue 4, 2012.
Tranner, D. S. Stephan Jabasingh and J. Jayalakshmi “Analysis of Cost Controlling In Construction Industries by Earned Value Method Using Primavera”; Int. Journal of Engineering Research and Applications, Vol. 4, Issue 6, June 2009.
Downloads
Published
Issue
Section
License
Copyright (c) 2018 Prof. M. C. Paliwal, Divya Chouriya

This work is licensed under a Creative Commons Attribution 4.0 International License.
IJOSCIENCE follows an Open Journal Access policy. Authors retain the copyright of the original work and grant the rights of publication to the publisher with the work simultaneously licensed under a Creative Commons CC BY License that allows others to distribute, remix, adapt, and build upon your work, even commercially, as long as they credit you for the original creation. Authors are permitted to post their work in institutional repositories, social media or other platforms.
Under the following terms:
-
Attribution — You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- No additional restrictions — You may not apply legal terms or technological measures that legally restrict others from doing anything the license permits.