Optimizing Planning and Scheduling while Monitoring Construction Projects: Review Paper

Authors

  • Nidhi Raghuwanshi M. Tech Scholar, National Institute of Technical Teachers Training and Research Institute, Bhopal, M.P, India
  • Prof. M.C. Paliwal Associate Professor, National Institute of Technical Teachers Training and Research Institute, Bhopal, M.P, India

Keywords:

Production; planning; scheduling; coupling; constraints.

Abstract

Completing a large construction project in time and within budget is not an easy task. Project planning and scheduling plays a central role in predicting both the time and cost aspects of a project. In this review paper various studies are presented related to Project planning, important benefits of good planning and the Working Principle of Primavera P6 are presented. Project Management modules once considered a necessary commodity in the Realty & Infrastructure construction sector is now viewed as a strategic asset for organizations.

Downloads

Download data is not yet available.

References

Alberto Cerezo-Narváez, Andrés Pastor-Fernández, Manuel Otero-Mateo and Pablo Ballesteros-Pérez, [Integration of Cost andWork Breakdown Structures in the Management of Construction Projects], Appl. Sci. 2020, 10, 1386; doi:10.3390/app10041386

Abdul Aziz and Sanjeet Kumar, [Financial and Work Management Analysis for Residential Construction: a Case Study], International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Volume-7, Issue-6C2, April 2019.

Ajesh Pilaniya and Ashwin A. Mahajan, [A Review of Planning & Scheduling of a Pune Metro Rail Project using Primavera P6 Web], IJSRD - International Journal for Scientific Research & Development| Vol. 6, Issue 09, 2018 | ISSN: 2321-0613.

Akshay R. Kohli, [Enterprise Project Management using Primavera P6 EPPM], International Research Journal of Engineering and Technology (IRJET), Volume: 04 Issue: 12 | Dec-2017, Impact Factor value: 6.171.

Anurag Mahure and Amitkumar Ranit, [Planning, Scheduling and Tracking of building Using Primavera P6], International Journal of Engineering Science Invention (IJESI), Volume 7 Issue 8 Ver III || Aug 2018 || PP 60-64.

Piyush Pramod Bagde and Abhijit N. Bhirud, [Project Management by Using Primavera P6 Software], Journal of Advances and Scholarly Researches in Allied Education, Vol. XV, Issue No. 2, (Special Issue) April-2018, ISSN 2230-7540.

R.Santhosh Kumar and Anoop James Antony, [Experimental Investigation on Preplanning of Road Construction by Using Primavera], International Journal of Innovative Research in Science, Engineering and Technology, Vol. 7, Issue 5, May 2018.

Samad M. E. Sepasgozar, Reyhaneh Karimi, Sara Shirowzhan, Mohammad Mojtahedi, Sabbar Ebrahimzadeh and David McCarthy, [Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK], Buildings 2019, 9, 191; doi:10.3390/buildings9090191.

Downloads

Published

01/22/2021

How to Cite

Raghuwanshi, N. ., & Paliwal, P. M. (2021). Optimizing Planning and Scheduling while Monitoring Construction Projects: Review Paper. SMART MOVES JOURNAL IJOSCIENCE, 7(1), 40–44. Retrieved from https://ijoscience.com/ojsscience/index.php/ojsscience/article/view/347

Issue

Section

Articles