A Comprehensive Review on Cost Optimization by Resource Allocation Using Primavera

Authors

  • Prof. M. C. Paliwal Professor, Department of Environment & Civil Engineering, National Institute of Technical Teachers Training and Research, Bhopal, M.P, India.
  • Divya Chouriya M.Tech Scholar Department of Environment & Civil Engineering, National Institute of Technical Teachers Training and Research, Bhopal, M.P., India

DOI:

https://doi.org/10.24113/ijoscience.v4i9.159

Abstract

Resources play vital role in construction projects. The performance of construction industry depends chiefly on how best the resources are managed. Optimization play pivotal role in resource management, but task is highly haphazard and chaotic under the influence of complexities and vastness. Management always looks for optimum utility of resources available with them. Hence, the project management has got important place especially in resource allocation and smooth functioning with allocated budget. To achieve these goals and to exercise enhance optimization certain tools are used for resource allocation optimally. Implementation of construction project needs a proper planning and scheduling is of vital importance for the project to be executed and run smoothly. A best schedule has to be prepared in such a way that meets the primary objectives of the total project. Those essential destinations are to make a quality venture, finished on time, inside spending plan, and in a sheltered workplace.

Downloads

Download data is not yet available.

References

Piyush Pramod Bagade and Prof. Abhijit Bhirud, “Review on construction project management software primavera p6” International journal of engineering sciences & research technology, ISSN: 2277-9655, January, 2018, PN (110-117).

Poonam Raykar and Ghadge A.N., “Analyzing the Critical Factors Influencing the Time Overrun and Cost Overrun in Construction Project” International Journal of Engineering Research, Volume No.5, 2016.

A. Ray Chaudhuri, B. Sivakonda Reddy and S.K. nimbal, “Resource Management in Construction Projects – a case study” Engineering Science and Technology: An International Journal (ESTIJ), ISSN: 2250-3498, Vol.2, No. 4, August 2017 PN (660 – 665).

T.Siva Nagaraju, Sri Lakshmana Kumar, “Schedule And Resources Optimization Using Primavera In Metro Rail Project”, IRF International Conference, 2016.

A.R. Nikumbh and S.S. Pimpliker, “Planning and controlling of a National Highway Project- A case study”, Journal of the Indian Road Congress Paper No.613, April – June 2014 PN (91 – 102).

P M Wale, N D. Jain , N R Godhani , S R Beniwal and A A Mir, «Planning and Scheduling of Project using Microsoft Project (Case Study of a building in India», IOSR Journal of Mechanical and Civil Engineering, ISSN: 2320-334X, Volume 12, Issue 3 Ver. III (May. - Jun. 2015), PN 57-63.

Shaik Mohammad, Kunal B. Badgujar, B.A.Konnur and Amarsinh B. Landage “A Review of EVM Analysis with Primavera”; International Journal of Engineering Research ISSN:23196890(online),2347-5013 Volume No.5, Issue Special 1 9 Jan 2014 PN: 164-167.

Hamid, R. Gupta, Parag S. Mahatme and Taran C. Bhagat “The cost controlling and monitoring of Construction project through earned Value management system” International Journal of Advanced Technology in Engineering and Science www.ijates.com Volume No 03, Special Issue No. 01, March 2013 ISSN (online): 2348 – 7550.

K Swarna Kumari And J Vikranth, “A Study On Resource Planning In Highway Construction Projects”, International Journal of Engineering Research And Application Volume 2, Issue 4, 2012.

Tranner, D. S. Stephan Jabasingh and J. Jayalakshmi “Analysis of Cost Controlling In Construction Industries by Earned Value Method Using Primavera”; Int. Journal of Engineering Research and Applications, Vol. 4, Issue 6, June 2009.

Downloads

Published

09/12/2018

How to Cite

Paliwal, P. M. C., & Chouriya, D. (2018). A Comprehensive Review on Cost Optimization by Resource Allocation Using Primavera. SMART MOVES JOURNAL IJOSCIENCE, 4(9), 1–4. https://doi.org/10.24113/ijoscience.v4i9.159